jueves, 26 de marzo de 2009

MINUTES OF MEETING: 23TH MARCH

Minutes of meeting
“JOMES”


DATE: 23th March 2009
AGENDA

1\\ We have decided the points of the teamwork. The group has divided the work into different points.

2\\ We have downloaded the CmapTools and we have installed.

3\\ Classification of the various items of work in the CmapTools.

4\\ Then we have uploaded the schema on the blog.

5\\ Look for a day for the next meeting. The group decided that the next meeting is going to celebrate 30th March.

MEETING ATTENDEES
Judith Ruano Vadillo
Óliver Serrano Hermoso
Sandra Testillano Sánchez
Montserrat Peña Mera
Isabel Plaza Olivas

lunes, 23 de marzo de 2009



JUDITH RUANO VADILLO

SANDRA TESTILLANO SANCHEZ

OLIVER SERRANO HERMOSO

ISABEL PLAZA OLIVAS

MONTSERRAT PEÑA MERA

martes, 10 de marzo de 2009

miércoles, 4 de marzo de 2009

there are some links that we can use to the work:

www.otrodesarrollo.com/biblioteca/CartaMundialNaturaleza1982.htm

www.acciona.es

www.ecoempleo.com/Estudios/SectoresIndustriales/capitulo2.pdf

www.navactiva.com/web/es/amedioa/doc/articulos///10856.php

MINUTES OF MEETING: 2TH MARCH


MINUTES OF MEETING
“JOMES”

DATE: 2th March 2009

AGENDA
  1. Look for more information for the work. Sandra Testillano and Judith Ruano are looking for a lot of information for this topic.
  2. Realise the minutes, publish the minutes in the blog, and the interesting links of Internet. Montse Peña is hung up all minutes in our blog, and the links that it can resulting useful to the work.
  3. Become to organize the information. Isabel Plaza and Óliver Serrano are dividing the information in the diferents groups of the topic.
  4. Look for a day for the next meeting. the group decided that the next meeting is going to celebrate 9th March.


MEETING ATTENDEES
- Judith Ruano Vadillo
- Óliver Serrano Hermoso
- Sandra Testillano Sánchez
- Montserrat Peña Mera
- Isabel Plaza Olivas